2-14 Extreme Networks Consolidated Hardware Guide
Site Preparation
(5 mm). Use a floor-leveling cement compound if necessary or bolt the racks to the floor
as shown in Figure 2-7.
Figure 2-7: Properly secured rack
Brace open distribution racks if the channel thickness is less than 1/4 inch (6.4 mm).
Evaluating and Meeting Cable Requirements
This section addresses requirements for the that cable you should use when installing
your network equipment. It includes:
Cabling Standards
Cable Labeling and Record Keeping
Installing Cable
RJ-45 Connector Jackets
Radio Frequency Interference