Extreme Networks Altitude 4700 Series Dokumentacja Strona 54

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 648
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 53
Hardware Installation
Altitude 4700 Series Access Point Product Reference Guide
54
3 Attach the radio antennas to their correct connectors.
For more information on available antennas, see “Antenna Options” on page 47.
4 Cable the Access Point using the approved power supply.
CAUTION
Do not supply power to the Access Point until the cabling of the unit is complete.
a Connect an RJ-45 CAT5e (or CAT6) Ethernet cable between the network data supply (host) and
the Access Point’s GE1/POE port.
b Verify the power adapter is correctly rated according the country of operation.
c Ensure the cable length from the Ethernet source to the Power Injector and access point does not
exceed 100 meters (333 ft). The Power Injector has no On/Off power switch. The Power Injector
receives power as soon as AC power is applied. For more information on using the Power
Injector, see “Power Injector System” on page 48.
5 Verify the behavior of the LEDs. For more information, see “LED Indicators” on page 57.
6 Align the bottom of the ceiling T-bar with the back of the Access Point.
7 Orient the Access Point’s chassis by its length and the length of the ceiling T-bar.
8 Rotate the Access Point chassis 45 degrees clockwise.
9 Push the back of the Access Point chassis on to the bottom of the ceiling T-bar.
CAUTION
Ensure the safety wire and cabling used in the T-Bar installation is securely fastened to the building
structure in order to provide a safe operating environment.
10 Rotate the Access Point chassis 45 degrees counter-clockwise. The clips click as they fasten to the T-
bar.
Przeglądanie stron 53
1 2 ... 49 50 51 52 53 54 55 56 57 58 59 ... 647 648

Komentarze do niniejszej Instrukcji

Brak uwag